The project, the agency that executes it, and the contractor named in the records.
Project
BGollarahatti - T10
OMMAS lists PMGSY-I work KN2594 as “BGollarahatti - T10”.
Road Name / Bridge Name: BGollarahatti - T10
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 24
Project / work ID
KN2594
OMMAS package number KN2594.
Package No.: KN2594
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 24
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 24
Contractor
PUTTASWAMY GOWDA MK [19 Dec 2012], M.K.PUTTASWAMY GOWDA
OMMAS lists the contractor for this work as “PUTTASWAMY GOWDA MK [19 Dec 2012], M.K.PUTTASWAMY GOWDA”.
Contractor Name: PUTTASWAMY GOWDA MK [19 Dec 2012], M.K.PUTTASWAMY GOWDA [19 Dec 2012]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 24
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹175.90 lakh
The sanction cost is recorded as 175.90 (₹ lakh).
Sanction Cost: 175.90
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 24
Maintenance cost due
₹8.78 lakh
The “5 Years Maintenance Cost Due” column shows 8.78 (₹ lakh).
5 Years Maintenance Cost Due: 8.78
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 24
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
02-01-2015
The completion date column reads “Financial: 22-08-2016/ Physical: 02-01-2015”; the physical completion date is 02-01-2015.
Completion Date: Financial: 22-08-2016/ Physical: 02-01-2015
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 24
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
4.140 km
Road length 4.140 km; 4.140 km recorded as completed.
Road Length (Kms): 4.140
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 24
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance