Project record
Marasandrapalya - T08
PMGSY-I · package KN2595 · C.N.Halli block · Maintenance
- Location
- C.N.Halli block, Tumakuru district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Marasandrapalya - T08
OMMAS lists PMGSY-I work KN2595 as “Marasandrapalya - T08”.
Road Name / Bridge Name: Marasandrapalya - T08
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 3
Project / work ID
KN2595
OMMAS package number KN2595.
Package No.: KN2595
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 3
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 3
Contractor
PUTTASWAMY GOWDA MK
OMMAS lists the contractor for this work as “PUTTASWAMY GOWDA MK”.
Contractor Name: PUTTASWAMY GOWDA MK [19 Dec 2012]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 3
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹109.60 lakh
The sanction cost is recorded as 109.60 (₹ lakh).
Sanction Cost: 109.60
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 3
Maintenance cost due
₹6.30 lakh
The “5 Years Maintenance Cost Due” column shows 6.30 (₹ lakh).
5 Years Maintenance Cost Due: 6.30
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 3
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-06-2013
The completion date column reads “Financial: 29-12-2014/ Physical: 30-06-2013”; the physical completion date is 30-06-2013.
Completion Date: Financial: 29-12-2014/ Physical: 30-06-2013
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 3
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
2.970 km
Road length 2.970 km; 2.970 km recorded as completed.
Road Length (Kms): 2.970
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 3
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 3