Project record
Abalakatte - T12
PMGSY-I · package KN2596 · Turuvekere block · Maintenance
- Location
- Turuvekere block, Tumakuru district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Abalakatte - T12
OMMAS lists PMGSY-I work KN2596 as “Abalakatte - T12”.
Road Name / Bridge Name: Abalakatte - T12
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 30
Project / work ID
KN2596
OMMAS package number KN2596.
Package No.: KN2596
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 30
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 30
Contractor
PUTTASWAMY GOWDA MK
OMMAS lists the contractor for this work as “PUTTASWAMY GOWDA MK”.
Contractor Name: PUTTASWAMY GOWDA MK [19 Dec 2012]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 30
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹76.70 lakh
The sanction cost is recorded as 76.70 (₹ lakh).
Sanction Cost: 76.70
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 30
Maintenance cost due
₹3.68 lakh
The “5 Years Maintenance Cost Due” column shows 3.68 (₹ lakh).
5 Years Maintenance Cost Due: 3.68
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 30
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-06-2013
The completion date column reads “Financial: 29-12-2014/ Physical: 30-06-2013”; the physical completion date is 30-06-2013.
Completion Date: Financial: 29-12-2014/ Physical: 30-06-2013
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 30
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
1.670 km
Road length 1.670 km; 1.670 km recorded as completed.
Road Length (Kms): 1.670
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 30
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 30