42. Existing Services / Utility Lines
Existing Drains, Pipes, Cables, Overhead Wires, Sewer Lines, Water Lines, Power Lines and
similar Services / Utility Lines encountered in the Course of the Execution of the Work shall
be protected / repaired / maintained in all respects in terms of Materials, Labours, etc.
against the knowingly / unknowingly Damage by the Contractor at the Contractor’s own risk
and cost. The Contractor shall not store Materials or otherwise occupy any part of the Site in
a manner likely to hinder the Operation of such Services.
43. Interference with Traffic and Adjoining Properties
a. All Operations necessary for the Execution and Completion of the Works and the
Remedying of any Defects therein shall, so far as Compliance with the Requirements of
the Contract Permits, shall be carried out so that not to interfere unnecessarily or
improperly with the following.
i. The Convenience of the public, or
ii. The Access to, Use and Occupation of Public or Private Roads and Footpaths or of
Properties whether in the Possession of the Employer or of any other person.
b. In case any Operation connected with the Traffic necessitates Diversion, Obstruction or
Closure of any Road, Railway or any other Right of Way, the Approval of the Employer and
the Concerned Authorities shall be obtained well in advance by the Contractor.
c. Further, it shall be the Responsibility of the Contractor to obtain required Permission /
Approval from the Concerned Traffic Police Authorities regarding Traffic Diversion at the
Contractor’s own Risk and Cost. The Employer will assist the Contractor in coordination
only.
d. Further the Contractor is liable to follow the rules and regulation stipulated by the traffic
department without fail. Event of accident or incident to the vehicles/public/pedestrian,
only the Contractor will be held responsible.
e. The Contractor shall provide Skilled Flagmen for Traffic Diversion as per the Requirement
of the Concerned Department.
f. The Contractor shall provide Traffic Barricades with Blinkers, Reflective Tapes, Road
Delineators, Traffic Cones, Portable Signages, Reflective Lights and other necessary Traffic
Signage as required, as directed by the Concerned Authorities and as per the
Specifications.
44. Protection of the White Topped Surface
The Contractor shall cover and protect the White Topped Surface till the Final Setting of the
Concrete against Rain; Leaves, Branches, Twigs of Trees; Footprints of Human beings /
Animals, etc. The Contractor shall be held fully responsible for any lapses in this regard. The
Contractor has to remove such defective work at his own risk and cost and redo the defective
work.
45. Concrete
The Contractor shall obtain Pavement Quality Concrete only from the Ready Mix Concrete
(RMC) Plants established by the Reputed Cement Manufacturers. The List of these Reputed
Cement Manufacturers shall be approved by the concerned Chief Engineer. Further, the
Contractor shall enter into a Memorandum of Understanding (MoU) with the Approved
Supplier by stating that the Supplier will be supplying the RMC to the Contractor on time as