Planning 13 Exhibit 2.1: Smart Road in Racecourse dug up by BBMP Exhibit 2.2: Smart Road in Shivamogga dug up by KUWSDB for 24×7 water supply project The State Government replied (April 2025) that due to high cost and economic infeasibility, site challenges, inter departmental issues, technical limitations and public impact, utility departments resorted to open trench utility laying method (March 2025). The reply is not acceptable as the smart road works were to be developed as per the Tender SURE Guidelines, which aimed at reducing inconvenience to the public and hence the objective of providing hassle free movement could not be achieved due to frequent digging of roads for laying and maintenance of utilities. 2.4.2 Non-inclusion of accessible infrastructure for specially abled persons on the roads/footpath projects Paragraphs 2.3 and 2.6 of Mission Guidelines stipulated that the city’s development under the Mission should be inclusive. Further, paragraph 31 of city level model template issued by Government of India (GoI) for preparation of SCP also stipulated inclusion of accessible infrastructure for specially-abled persons under the mission. In the context of the above, development of roads/footpath packages was to include the provision of tactile tiles for the visually impaired on footpaths. However, the above provision was not made in footpaths constructed in 21 smart road projects undertaken by seven smart cities. The State Government replied (April 2025) that footpath works taken up in smart cities were mostly retrofitting in nature. The roads where footpath development was contemplated already had developed footpaths and did not have uniform carriage width which was not conducive for construction of continuous and consistent footpaths. Further, it stated that steel handrails were provided in the smart roads to improve access to specially abled persons The reply was not acceptable as the primary purpose of the handrails was to prevent pedestrians from crossing indiscriminately and slipping onto the carriageway, as outlined in the IRC:103-2012.
CAG Report No. 11 of 2025 — Implementation of Smart City Mission, Government of Karnataka
Comptroller and Auditor General of India
Page 29 of 110
Text as extracted by CivicProof (at ingest, or when the investigator fetched the record). Structured records (portal API responses) are shown as field: value lines.