Implementation of Projects and Monitoring 37 implemented by the TSCL and calculated the extra financial implication of ₹2.75 crore due to implementation of RADAR based ATCS solutions. The State Government replied (April 2025) that while floating RFP, SSCL had ensured that the type of vehicle detector being sought was technology agnostic and the bidder was free to propose an appropriate technology that can be either Radar or Camera. The above reply was not acceptable as the technical specifications of the RFP should have been prepared in accordance with the directions of the Technical Committee considering the huge cost of radar-based sensors. 4.7.2.3 Incomplete assessment of the requirement in RFP Audit observed the following deficiencies in the RFP of BSCL with respect to ITMS: i) Vehicle breakdown detection system: The RFPs did not cover the above analytics which was effective in avoiding traffic congestion and accidents. ii) Revenue generation: The RFP did not provide for automated traffic challan generation. As traffic violating vehicle numbers would be detected by ANPR analytics, automatic generation of traffic violation challans would ensure increased compliance with the traffic rules. The State Government replied (April 2025) that due to budget constraints the vehicle breakdown detection system and challan generation system was not considered, and the project is still in execution phase. The reply is not tenable as the RFP did not include the above components for holistic implementation of ITMS and revenue generation could not be achieved. 4.7.3 Information Communication Technology enabled Solid Waste Management System Information Communication Technology (ICT) enabled SWM was one of the smart features implemented by the Smart Cities under ICCC Project. The scope of the ICT enabled SWM included the following: • Design, development, supply, deployment and installation of web-based application software integrated with GPS and RFID devices. • Supply and installation of hardware, software and network devices required in the data centre for using the integrated SWM. • Supply and installation of RFID tags and readers, providing of automatic vehicle locator solution at primary and secondary collection points. • Supply and installation of surveillance cameras at bulk waste generation points and provide GPS based attendance system for the staff. • Providing an MIS System capable of recording the details of daily waste receipt, waste processed, and waste disposed in terms of tonnage. • Integration of SWM with City Operation Centre. Out of seven smart cities in Karnataka, four cities viz., Belagavi, Hubballi- Dharwad, Mangaluru and Shivamogga implemented ICT enabled SWM components under ICCC. ICCC project in Shivamogga city was yet to be made
CAG Report No. 11 of 2025 — Implementation of Smart City Mission, Government of Karnataka
Comptroller and Auditor General of India
Page 57 of 110
Text as extracted by CivicProof (at ingest, or when the investigator fetched the record). Structured records (portal API responses) are shown as field: value lines.