Chapter-IV 40 non-provision of information such as location of CCTV cameras, data related to bus routes and stations by HDBRTS. • Integration of Centralised Control and Monitoring System (CCMS) for LED streetlights also was not carried out as the project for installation of LED light on PPP basis did not materialise. • Integration of disaster management systems, environmental sensors, energy meters, digital display boards and smart health kiosk were yet to be accomplished. The State Government stated that the integration of line departments with ICCC is pending due to, either non- readiness of local system at department level or due to security reason, line departments are not willing to provide API/information for further integration with ICCC. The reply confirms the fact that there is lack of inter-departmental coordination indicating sub-optimal functioning of ICCC. Recommendation 5: The State Government should ensure operationalization of Centralised Command and Control Centre with integration of all data centres of seven cities to achieve the intended objectives. 4.7.5 Other Smart Solutions 4.7.5.1 Smart Water supply The Smart Water component implemented by BSCL aimed to establish an Information Management System (IMS) for water consumption tracking, integrating data from bulk flow meters, pressure sensors, and water quality monitoring tools (PH, turbidity, chlorine sensors). MSI would make provision for future integration of Water SCADA33 and smart domestic meters in the Smart Water Management System. MSI installed 28 bulk flow meters, sensors, and provided 20 Android devices for meter reading and cloud-based database management for 1,00,000 users. The total expenditure on this was ₹0.63 crore. Audit observed the following: ➢ Duplication of work: The scope of the 24×7 water supply scheme implemented by KUIDFC under progress also included installation of flow meters, PH, turbidity and chlorine content sensors. This resulted in duplication of work. ➢ Unutilized assets: Despite the BSCL's request (February 2022) for the Belagavi City Corporation to take over the Android devices and cloud- based DBMS, these assets remained unused, making ₹0.36 crore expenditure unfruitful. ➢ SCADA integration: While the Smart Water initiative included future SCADA integration with the ICCC, the 24×7 water supply project by 33 Supervisory Control and Data Acquisition System.
CAG Report No. 11 of 2025 — Implementation of Smart City Mission, Government of Karnataka
Comptroller and Auditor General of India
Page 60 of 110
Text as extracted by CivicProof (at ingest, or when the investigator fetched the record). Structured records (portal API responses) are shown as field: value lines.