Chapter-IV 58 not carried out which rendered the project ineffective and unsafe during flooding. Recommendation 8: The SPVs should ensure that the works taken up under the Mission conformed to the relevant standards and that the recommendations of the technical experts are duly considered during their implementation. C MONITORING 4.13 In-adequate representation of Urban Local Bodies in the Board of Directors of SPVs Paragraph 14.1 of Article of Association (AoA) of SPVs of Smart City stipulated that the Board of Directors would comprise minimum seven and maximum 15 Directors. As per the AoA, out of 15 members, one Director was to be nominated by MoHUA, eight Directors by GoK and six Directors by ULB including Commissioner of the ULB. Audit observed that there is inadequate representation of ULB members (less than six) in the Board of Directors of SPVs of Smart Cities. The inadequate representation of ULBs in the Board of Directors carried the risk of insufficient articulation of the city specific needs and aspirations in smart city planning apart from inadequate support and oversight in their implementation and continued maintenance of the infrastructure created. The State Government accepted (April 2025) the audit comment and replied that the reason for lack of representation was due to non-receipt of nominations from the ULBs. 4.14 Non-appointment of Quality Supervision Consultant Mission Guidelines prescribed that SPV should monitor and review quality control matters and acted upon issues arising thereon. GoK also issued (February 2005) instructions that third party inspection should be mandatory in respect of all works contracts of estimated value more than ₹2.00 crore and all goods and equipment contracts of estimated value of ₹25.00 lakh. Audit observed that none of the SPVs had appointed Third Party Quality Supervision Consultant as per the instructions/guidelines. SPVs were completely dependent on the quality test reports submitted by the contractors and there was no independent evaluation of the quality of the works executed under the Mission. The State Government replied (April 2025) that since PMCs were assigned with the responsibility of third-party inspections, there was no necessity to appoint separate third-party Quality Supervision Consultant. Reply cannot be accepted as the scope of the PMC did not include periodic inspection of all the works,
CAG Report No. 11 of 2025 — Implementation of Smart City Mission, Government of Karnataka
Comptroller and Auditor General of India
Page 78 of 110
Text as extracted by CivicProof (at ingest, or when the investigator fetched the record). Structured records (portal API responses) are shown as field: value lines.