Skip to content
CivicProof

CAG Report No. 11 of 2025 — Implementation of Smart City Mission, Government of Karnataka

Comptroller and Auditor General of India

Page 85 of 110

Appendices
63
Sl No Smart city Name of the project Smart Feature
48 Hubballi-Dharwad Digital Display Board IT Connectivity
49 Hubballi-Dharwad Tolankere Lake Development Phase-02 Open Spaces
50 Hubballi-Dharwad Swimming Pool Development Phase-02 Other
51 Hubballi-Dharwad Smart Road Package-03 Road length: 5.069
Kms
Transportation and
Mobility
52 Hubballi-Dharwad Green mobility corridor (SCM Funded with
AFD Grant)
Transportation and
Mobility
53 Hubballi-Dharwad Nala Renovation Waste Water Management
54 Hubballi-Dharwad LED Street Lighting Energy Efficiency
55 Mangaluru Upgradation of Existing Water Jetty Economy and employment
56 Mangaluru Skill Development and Safety Training
Centre – OPEX Education
57 Mangaluru
Conversion of Existing 11 KV HT/LT
overhead lines of 11 KV Bolara and
Mangaladevi feeders
Energy Supply
58 Mangaluru Upgradation of Wenlock Hospital - Infra
works Health
59 Mangaluru
Selection of System Integrator for
Implementation of Command and Control
Center Components in Mangaluru City
IT Connectivity
60 Mangaluru Rejuvenation of Kavoor Lake for
Rainwater harvesting and recreation Open Spaces
61 Mangaluru Waterfront Area Development Sub Project
- Promenade Development Phase 2B Open Spaces
62 Mangaluru Area Development at Sulthan Bathery Open Spaces
63 Mangaluru
Construction of Indoor Stadium for
Kabaddi and Shuttle Badminton near Urva
Market
Other
64 Mangaluru
Connector Road from NH66 near Jeppu to
Morgans gate including construction of
RUB
Transportation and
mobility
65 Mangaluru Smart Road – Package 2 (Loop Road) Transportation and
mobility
66 Mangaluru Pedestrian Sea-River Link Bridge at
Sulthan Bathery
Transportation and
mobility
67 Mangaluru
Construction of Under Ground Drainage in
Zone IV part 2 and Zone III part 1 in ABD
Area (UGD - 2)
Waste Water Management
68 Mangaluru
Restoration Scheme for the collapsed
portion of the existing stone revetment of
Nethravathi riverbank and SSM jack well
No.2
Water Supply
69 Mangaluru Redevelopment of Central Market along
with Fish Market Economy and Employment
70 Shivamogga Construction of MLCP with commercial
complex Economy and Employment
71 Shivamogga
Construction of Govt College and Govt PU
Girls College, BH Road Shivamogga
(Under Advisory-15)
Education
72 Shivamogga
Conversion of Existing Over Head 11
KV/LT lines into Partial UG cable for
Facilitating Railway Flyover from Usha
nursing home Circle to LBS Nagara
Chowdamma Temple
Energy Supply

Text as extracted by CivicProof (at ingest, or when the investigator fetched the record). Structured records (portal API responses) are shown as field: value lines.