Appendices 66 Sl. No Smart City Name of the project Smart Feature 29 Davanagere Mist Technology Vehicle and other necessary equipment for Fire and Emergency Services Department. Safety 30 Davanagere Construction of Public E-toilets in Parks at 9 Locations in Davanagere. Sanitation 31 Davanagere Improvement of Mandipet Road in Davanagere City Transportation and Mobility 32 Davanagere Construction of Skew bridge across outer ring road and other culverts across storm water drain Transportation and Mobility 33 Davanagere Afforestation along Roads Phase –II Transportation and Mobility 34 Davanagere Relocation of Old Bus stand Transportation and Mobility 35 Davanagere Remodelling of storm water drains in ABD area - Kondajji Road Drain Waste Water Management 36 Davanagere Remodelling of storm water drains in ABD area – SPS Nagar drain Waste Water Management 37 Davanagere Providing Raw water Transmission Bypass line by tapping the existing pipeline nearby Kundawada lake directly to Kundawada WTP. Water Supply 38 Davanagere Development, operating and maintenance of Smart Bus Q Shelters at 52 locations in Davanagere city on PPP mode at Davanagere phase 1 Transportation and Mobility 39 Hubballi-Dharwad Renovation of Core Markets - Janata Bazaar Package (A) Rehabilitation of 200 Kattas Economy and Employment 40 Hubballi-Dharwad Smart School Education 41 Hubballi-Dharwad Smart Healthcare Health 42 Hubballi-Dharwad Procurement and Installation of Boom Barriers IT Connectivity 43 Hubballi-Dharwad ICCC– Services IT Connectivity 44 Hubballi-Dharwad ICCC- Room Interior IT Connectivity 45 Hubballi-Dharwad M G Park Phase- I (musical fountain) Open Spaces 46 Hubballi-Dharwad Redevelopment of Swimming Pool at Hubballi Other 47 Hubballi-Dharwad Sanitary Napkin Vending Machine Sanitation 48 Hubballi-Dharwad Basic Services to Urban Poor (BSUP) Package-03 (35 Roads) Road Length-5.911Km Transportation and Mobility 49 Hubballi-Dharwad Smart Roads Package-04 New Roads (Total road length - 2.07 Km, ) Transportation and Mobility 50 Hubballi-Dharwad Desilting of Rajnalla (South) Waste Water Management 51 Mangaluru Skill Development and Safety Training Centre - CAPEX Education 52 Mangaluru Conversion of Conventional lights into LED Lights in Government Buildings Energy Efficiency 53 Mangaluru Construction of additional floor at existing building of Lady Goschen hospital Health 54 Mangaluru Establishing Karnataka Urban Observatory and Centre of Excellence at Bengaluru IT Connectivity 55 Mangaluru Rejuvenation of Gujjarakere Lake for Rainwater harvesting and recreation Open Spaces 56 Mangaluru Construction of Clock Tower at Clock Tower Junction Transportation and mobility
CAG Report No. 11 of 2025 — Implementation of Smart City Mission, Government of Karnataka
Comptroller and Auditor General of India
Page 88 of 110
Text as extracted by CivicProof (at ingest, or when the investigator fetched the record). Structured records (portal API responses) are shown as field: value lines.