Appendices 70 7 Belagavi Energy Aiming at reduction of T&D losses by underground HT & LT lines by 2019 Not Known UGLT - funding reduced from ₹ 168 crore to ₹ 104 crore - 11 UGLT projects implemented for ₹ 94.15 crore, One project of Energy Audit for ₹ 0.24 crore was taken up and completed. UGLT Package 12 - dropped in 16th BM due to lack of funds. UG-HT was already implemented by HESCOM for ₹ 316.27 crore. Five convergence projects regarding electrical poles, ULLT and streetlights were taken up by various implementing agencies for ₹ 32.96 crore. However, due to inadequate information in respect of T&D losses, the achievement could not be assessed. 8 Belagavi Energy retrofitting of existing streetlights with LED to minimize energy consumption by 2017 Unachieved Energy Efficient Lighting Project taken under PPP -₹ 69.91 crore was under Implementation 9 Belagavi Energy Achieve 100 per cent door to door collection, segregation, scientific treatment and disposal ensuring waste to energy by 2017. Partly Achieved As ICT enabled SWM projects taken up under ICCC is put to use and door to door collection is being going on. However, segregation, scientific treatment and disposal ensuring waste to energy not known. 10 Belagavi Transport Mobility and Accessibility Ensuring Intelligent Transport System assured last mile connectivity. Also ensuring of a city and 8 satellite bus terminals by 2019. Unachieved Central Bus Station project was under Implementation. Proposed PPP funding of ₹ 50 crore was removed in 08th BM. Convergence funding not mobilized. No satellite bus station was taken for development. ICT enabled project ITS taken under ICCC was not put to use as commented in the audit report. 11 Belagavi Transport Mobility and Accessibility Assured hassle free urban mobility, by completing 4 ROBs, 3 flyovers, under passes, junction improvement, pathway improvement, multi-level parking, dedicated parking zones and also ensuring safety and security through E-surveillance and police by 2018. Partly Achieved Funding for flyover changed to SCM and reduced to ₹ 100 Crore in 08th BM, which was later deleted in 16th BM due to high cost and request of MLA. The work of underpass was - deleted in 08th BM. However, RoB at Old Gogte Road and 03rd Gate, and Over Bridge at Kapileshwar Road and Old PB Road were executed by PWD and Railway Department for ₹ 86.7 crore. 12 Belagavi Transport Mobility and Accessibility Development of cycle tracks, improvement of footpath for walkability by completing 407 and 702 km by 2017 respectively Partly Achieved 40 projects worth ₹ 535.78 crore were taken up for Smart Roads, Paver Block Roads, NMV Packages, Bus Shelters, White Topping Packages. Four projects of ₹ 52.7 crore for Bus Shelter, NWKSRC, were dropped in 08th BM. Two Projects of ₹ 0.90 crore were taken for road side water kiosks. 18 Convergence projects for Roads, CBT NMT were taken by various implementing agency for ₹ 262.33 crore. One project of Public Bike Sharing has been taken up on PPP mode for ₹ 3.71crore. 13 Belagavi Transport Mobility and Accessibility Making available non-motorized streets, walkability, network connectivity and paratransit transport by year 2017. Partly Achieved 14 Belagavi Energy Ensuring the CDP of 2014 implemented with issue of building permissions mandating solar rooftop panels aiming towards provisioning for green building by 2018 along with already mandated rain water harvesting and solar water heater Not Known In the absence of adequate information, Audit could not assess the achievement against the Goal. 15 Belagavi Energy Achieve 80% coverage of flat roofed government buildings with Solar PV Panels by 2018. Unachieved The project was dropped in 08th BM. A project of Solar panel SRTPV system under IPDS project for ₹ 1.5 crore was taken up by other implementing agency.
CAG Report No. 11 of 2025 — Implementation of Smart City Mission, Government of Karnataka
Comptroller and Auditor General of India
Page 92 of 110
Text as extracted by CivicProof (at ingest, or when the investigator fetched the record). Structured records (portal API responses) are shown as field: value lines.