Appendices
72
25 Bengaluru
Transport
Mobility and
Accessibility
Connect such landmarks by non-motorized
transportation network towards a vibrant
urban precinct Achieved
IN 12 Road projects, 2 Km of cycle track network has been developed by the SPV to promote
the non-motorised transport system
26 Bengaluru Basic Amenities
Assured supply of 135 LPCD water through
public delivery channels Unachieved
There was no allocation made in the SCP. SPV has not taken any project in this regard and
due to inadequate information in this regard, Audit could not assess the achievement against
this Goal.
27 Bengaluru Basic Amenities
Flow of untreated sewerage into storm water
drains and lakes cut by 70% in the ABD Unachieved
None of the project has been taken by the SPV
28 Bengaluru Basic Amenities
All public places in the ABD has access to
public toilets thereby reducing open
defecation and urination by 70%
Partly
Achieved
BBMP is assigned with installation and maintenance of toilets throughout Bengaluru
including ABD area of BenSCL. However, toilets have been provided as part of integrated
mobility hub and junction improvement at K.R Market Project.
29 Bengaluru Basic Amenities
Reduction in open garbage dumps on roads
and in market centres Partly
Achieved
Dustbin/ garbage bins has been provided in all 32 roads of 12 Road projects by the SPV for
the collection of Dry and Wet waste.
30 Bengaluru
ICT enabled
Smart
Governance
100% of garbage related grievance resolved
within 12 hours Partly
achieved
ICCC has been taken up for an amount of ₹ 118.87 crore in two phases. However, the project
has been in operational. Grievance Management has been included as IGMRS in ICCC
project. The SWM and its component had been descoped in ICCC project due to formation
of Bengaluru Solid waste Management Limited. Same was approved in 22nd Board meeting
the call centre manage all grievances related to BBMP including SWM.
31 Bengaluru Basic Amenities Garbage sent to landfills from bulk producers
reduced by 40% Unachieved. There was no allocation made in SCP. SCP has not taken any project in this regard.
32 Bengaluru
ICT enabled
Smart
Governance
Reduction in crimes including crimes against
women and children Not Known
Due to inadequate information, Audit could not assess the achievement against this Goal. A
project of ₹ 8.73 crore has been taken by SPV for Providing Smart Traffic Solution to
Bangalore Traffic Police in the ABD area. Phase 2 has been taken up for ₹ 1.94 crore.
33 Bengaluru
ICT enabled
Smart
Governance
Enhance neighbourhood safety and security
Unachieved
Project dropped in 07th BM by SPV.
34 Bengaluru Energy Uninterrupted and reliable power supply for
all citizens in Bengaluru Unachieved Due to inadequate information, Audit could not assess the achievement against this Goal.
35 Bengaluru Energy
10% of aggregate power demand met through
renewable energy source Unachieved
No project taken up by the SPV. Due to inadequate information, Audit could not assess the
achievement against this Goal. A project of ₹ 1.9 crore was taken for LED lighting for Vidhana
Soudha which was not aligned to the Goal.
36 Bengaluru
ICT enabled
Smart
Governance
30% of city budgets utilized through
participatory budgeting processes Unachieved
Project has not been taken up by the SPV
37 Bengaluru
ICT enabled
Smart
Governance
Maximize reach and range of service in the
existing platform of e-governance Achieved
ICCC One City One Number, One City One Portal and One City One App is implemented to
facilitated citizens to register grievance across multiple line department which handle civic
services also information dissemination of public project status through web portal to ensure

Text as extracted by CivicProof (at ingest, or when the investigator fetched the record). Structured records (portal API responses) are shown as field: value lines.