Appendices 77 Conversion of Conventional lights into LED Lights in Government Buildings - 2.23 Cr - Ongoing, Retrofit Car Street and areas of Sri Venkatramana Temple- ₹ 4.95 Cr - Ongoing Conversion of Existing 11 KV HT/LT overhead lines at Mangaladevi Temple road and New Monkey Stand road - ₹ 3.78 Cr - Ongoing. Execution of model sub division works in Attavara taken by MESCOM for ₹ 141.54 Cr. 76 Mangaluru Education and Health Build on high standards of Cleanliness, Public Health and Safety Partly Achieved Four works of ₹ 52.34 crore at Lady Goshen Hospital and Wenlock Hospital were taken up and all are completed as of June 2024. A project of ₹ 4.75 crore was taken up for Skill Development Centre. Civil Work is completed. Training to commence shortly. 77 Mangaluru Park and Public Space Make use of underutilized rivers, beaches, forests and hills for a) Public Place Making, b) Water and Energy Resource, c) Transport Recreation and Tourism, d) Education and Ecological Protection Unachieved Community Level Facilities along with international swimming pool – Completed work - ₹ 22.53 Cr. Construction of B.R.Ambedkar Bhavan is taken up by KHB for Rs 10.46 Cr. 78 Mangaluru Basic Amenities Move towards zero-waste economy Unachieved 100 per cent water supply coverage along with residential meter; water quality monitoring and SCADA Project of ₹ 10 Crore was deleted in 13th BM . Further, ₹ 114 Crore was transferred to KUIDFC to implement 24*7 water scheme which was under implementation. A Work of 24*7 water supply is taken by MCC for ₹ 35 Cr. 79 Mangaluru Affordable Housing including Slum Development Focus Community and Place-making on making quality affordable housing and nodal civic space Partly Achieved A Project of EWS housing is taken by MCC for ₹ 6.24 Cr. 80 Mangaluru Basic Amenities 100% compliance of SWM Rules 2000 Unachieved Projects were deleted in 07th BM, since MCC outsourced SWM. 2 Projects of UGD, ₹ 95.01 crore were deleted in 19th HPSC to divert the fund. 04 UGD Projects of ₹ 40.12 Crore were taken up and ongoing, ineffectiveness of the same is commented in the audit report. Restoration of the collapsed portion of the existing stone revetment of Nethravathi river bank and SSM jack well No.2 on the upstream side of Thumbe vented dam, Mangaluru is taken for ₹ 10.50 crore, which was not aligned to the Goal. Six Works regarding UGD and sewerage system are taken by KUIDFC and MCC for ₹ 336.42 cr. Non-linking of STP and sewerage system is commented in the audit report. 81 Mangaluru ICT enabled Smart Governance Establish digital and physical networks in polycentric approach to Governance, IT, Place-making, Healthcare, Transportation and Integrated Energy Model Unachieved ICCC Phase-3 worth ₹ 23.69 crore was deleted in 12th BM. Patrolling vehicle project, ₹ 36 lakh was dropped in 07th BM. ₹ 12.2 crore was incurred towards KMDS Data Centre, ₹ 01 crore was incurred towards Establishing Karnataka Urban Observatory and Centre of excellence at Bengaluru. ₹ 72.60 Crore is incurred towards establishments of ICCC in six works. None of the work reached go live till date. 82 Mangaluru Economy and Employment Strengthen connection with Lakshadweep Islands both for trade and tourism Unachieved No projects were taken by SPV to promote connection with Lakshadweep 83 Mangaluru Economy and Employment Make Mangaluru a hub for gastronomy and fresh produce(coffee, fish, cashew nuts, fruits, vegetables) Unachieved No projects taken by SPV in this regard. Redevelopment of vacant premises of Old DC office into hotel, retail shops and speciality restaurant-worth ₹ 10 crore - dropped in 15th BM. Retrofitting of tile factories into hotel- ₹ 67.24 Cr - dropped in 12th BM, Redevelopment of Brick Factory into commercial Space - Dropped in 19th HPSC
CAG Report No. 11 of 2025 — Implementation of Smart City Mission, Government of Karnataka
Comptroller and Auditor General of India
Page 99 of 110
Text as extracted by CivicProof (at ingest, or when the investigator fetched the record). Structured records (portal API responses) are shown as field: value lines.