Tender document — White Topping of Selected Roads under GoK Grants, Package-2 (BBMP, Project Central-8)

Bruhat Bengaluru Mahanagara Palike, via Karnataka Public Procurement Portal

Comprehensive Development of Selected Roads by Providing
White Topping Under GoK Grants Package - 2 Technical Bid
Tenderer Page 35 of 65 Executive Engineer,
PC-8, BBMP, Bengaluru
c. For Liability of both Parties and of any Employer’s Representative for Death and Injury to
the Contractor’s Personnel except to the Extent that Liability arises from the Negligence of
the Employer, any Employer’s Representative or their Employees.
13.2 Policies and Certificates for Insurance shall be delivered by the Contractor to the Employer
for his Approval before the Start Date. All such Insurances shall provide for Compensation to
be payable to rectify the Loss or Damage incurred. All Payments received from Insurers
relating to Loss or Damage shall be held jointly by the Parties and used for the Repair of the
Loss or Damage or as Compensation for Loss or Damage that is not to be repaired.
13.3 If the Contractor fails to effect or keep in force any of the Insurances referred to in the
previous Sub Clauses or fails to provide Satisfactory Evidence, Policies or Receipts, the
Employer may without Prejudice to any other Right or Remedy, effect Insurance for the
Cover relevant to such Default and pay the Premiums due and recover the same as a
Deduction from any other Monies due to the Contractor. If no Payment is due, the Payment of
the Premiums shall be a Debt Due.
13.4 Alterations to the Terms of Insurance shall not be made without the Approval of the
Employer.
13.5 Both Parties shall comply with any Conditions of the Insurance Policies.
14. Site Investigation Reports
14.1 The Contractor, in preparing the Tender, shall rely on any Site Investigation Reports referred
to in the Contract Data, supplemented by any Information available to the Tenderer.
15. Queries about the Contract Data
15.1 The Employer will clarify Queries on the Contract Data.
16. Contractor to construct the Works
16.1 The Contractor shall construct the Works in accordance with the Specifications and
Drawings.
17. The Works to be completed by the Intended Completion Date
17.1 The Contractor may commence Execution of the Works on the Start Date and shall carry out
the Works in accordance with the Program submitted by the Contractor, as updated with the
Approval of the Employer, and complete them by the Intended Completion Date.
18. Approval by the Employer
18.1 The Contractor shall submit Specifications and Drawings showing the proposed Temporary
Works to the Employer, who is to approve them if they comply with the Specifications and
Drawings.
18.2 The Contractor shall be responsible for the Design of Temporary Works.
18.3 The Employer’s approval shall not alter the Contractor’s Responsibility for Design of the
Temporary Works.
18.4 The Contractor shall obtain Approval of Third Parties for the Design of the Temporary Works
where required.
18.5 All Drawings prepared by the Contractor for the Execution of the Temporary or Permanent