24. Safety of Workers
In respect of all Labour directly or indirectly employed in the Work for the Performance of
the Contractor's Part of this Agreement, the Contractor shall at his own Expense arrange for
the Safety Provisions as per Indian Standard Safety Codes shown below and shall at his own
Expense provide all Facilities in connection there with. In case, the Contractor fails to make
Arrangement and provide Necessary Facilities as aforesaid, he shall be liable to pay
Rs. 1000/- per Day for each day of Delay from
the Date of Notice issued to the Contractor ion this regard and in addition the Employer shall
be at liberty to make Arrangement and provide Facilities as aforesaid and recover the Cost
incurred on that behalf from the Contractor, and no Claims whatsoever shall be entertained.
i. IS: 3696 (Part I) – 1966 Safety Code for Scaffolds and Ladders
ii. IS: 3696 (Part II) – 1966 Safety Code for Scaffolds and Ladders, Part II Ladders
iii. IS: 3764 – 1966 Safety Code for Excavation Work
iv. IS 4081 – 1967 Safety Code for Blasting and Drilling Operations
v. IS: 4138 – 1977 Safety Code for Working in Compressed Air
vi. IS: 5121 Safety Code for Piling and other Deep Foundations
vii. IS: 5916 – 1970 Safety Code for Construction involving Use of Hot
Bituminous Materials
viii. IS: 7293 – 1974 Safety Code for Working with Construction Machinery
ix. IS: 7969 –1975 Safety Code for Storage and Handling of Building Materials
x. Any other Code and / or as per directions of the Employer.
25. The Employer shall have Full Powers to send Workmen and employ on the Premises to
execute Fittings and other Work not included in the Contract. For whole Operations, the
Contractor is to afford every Reasonable Facility during Ordinary Working Hours provided
that such Operations shall be carried on in such a manner as not to impede the Progress of
the Work included in this Contract in the opinion of the Employer.
26. The Contractor shall conduct his Work so that not to interfere with or hinder the Progress or
Completion of the Work being performed by other Contractors, Piece Workers or by the
Employer and shall as far as possible arrange his Work and shall place and dispose the
Operations of the other Contractors, Piece Workers, or of the Employer. The Contractor shall
arrange his Work with that of the others in an Acceptable Manner and shall perform it in
Proper Sequence to the complete Satisfaction of the Employer at the Contractor’s own Cost.
27. No Waiving of Legal Rights and Powers
The Employer shall not be precluded or stopped from taking any Measurements and Framing
of Estimates or Detaining any Certificates made either before or after the Completion and
Acceptance of the Work and Payment, from showing the True Amount and Character of the
Works Performed and Materials furnished by the Contractor and from showing that any such
Measurements, Estimates or Certificates Untrue or incorrectly made and that the Employer
shall not be precluded or stopped from recovering from the Contractor and such Damages as
it may be sustained by Reasons of his Failure to comply with the Terms and Conditions of the