Tender document — White Topping of Selected Roads under GoK Grants, Package-2 (BBMP, Project Central-8)

Bruhat Bengaluru Mahanagara Palike, via Karnataka Public Procurement Portal

Comprehensive Development of Selected Roads by Providing
White Topping Under GoK Grants Package - 2 Technical Bid
Tenderer Page 48 of 65 Executive Engineer,
PC-8, BBMP, Bengaluru
shall have been given to the Contractor, either himself be present to receive the Orders and
Instructions or have a responsible Site Engineer duly accredited in writing, to be present for
that Purpose.
19. Foreign Exchange
It shall be clearly understood that no Foreign Exchange shall be made available for the
Purpose of Equipment, Plants, Machinery or Materials of any kind or any other Items /
Purposes required to be carried out in Execution of the Work. It shall be clearly understood
that no Foreign Exchange required for importing Equipments, Materials for Tools, Plants and
Machinery, etc. that may be required in carrying out the Work, even from the Rupee Payment
Country will be made available.
20. The Contractor shall make his own arrangement at his own Cost for the Provision of
Telephone Facilities at the Site of Works or at any other place.
21. No Accommodation is available at the Site of Work for Office, Residence, Labour, Store,
Casting Yard, etc. and the Contractor has to make his own Arrangement and no Claim
whatsoever on this account shall be entertained.
22. The Contractor shall make his own arrangement for the Disposal of the Spoils / Excavated
Earth / Debris from the Works to such Place, approved by the Employer, where the same
shall not cause Nuisance and shall be acceptable to the Authorities concerned.
23. The Electric and Water Connections to be obtained for use of the Work under the Contract
are subject to the following Conditions.
a. The Contractor shall make his own arrangement for Electricity and Water Supply.
However, the Employer will assist the Contractor to get Power from the concerned
Department at the Contractor’s Cost.
b. The Employer shall in no way be Responsible for any Delay in getting the Electric
Connection and Water and no Claim on this account whatsoever, shall be entertained. It
shall be clearly understood that the Contractor has to make his own Arrangement for
Generators for use before the Electric Connection is made available and also to be used as
a Stand by Arrangement in case of Power Failure, etc. or in the case of Disconnection of
Electric Supply by the concerned Department for any reason.