Chapter-IV 34 The reply was not acceptable as in absence of specific guidelines for qualifying the lead bidder in KTPP rules, the model RFP document provided by MoHUA was to be considered. Regarding modification of OEM post award of work, it was applicable only in exigency of the closure of the company as per the Model RFP. Recommendation 4: The SPVs should ensure that the software applications installed are used effectively, should be timely and should not reach end of life/support during the contract period. 4.7 Implementation of smart solutions by SPVs As per the para no 2.5 of Mission guidelines, smart solutions adopted in the Pan City projects were to be adaptive or based on best practices that worked in another city. The various smart solutions proposed by the Smart Cities are detailed in the Table 4.6. Table 4.6: Details of smart solutions proposed in the SCPs S.L No Smart Solutions BSCL BenSCL DSCL HDSCL MSCL SSCL TSCL 1 Intelligent Transport System 2 Intelligent Traffic Management System 3 Intelligent Solid Waste Management 4 Smart Classroom 5 One City One Portal 6 Smart Water 7 Smart Health 8 Smart Parking Source: Information furnished by Smart Cities On evaluation of ICT enabled smart solutions implemented by the Smart Cities, Audit observed that utility of these technological interventions was negligible due to incomplete assessment of requirements, lack of coordination with other agencies and selection of technology without considering the requirement of end-users. Detailed observations are brought out in the succeeding paragraphs: 4.7.1 Intelligent Transport System The ICCC project included Intelligent Transport System (ITS) with the following objectives: • Installation of GPS based Automated Vehicle Locator System (AVLS) connected with City Operation Centre. • Installation of variable message sign at the selected bus shelters • Integration of the AVLS on GIS maps
CAG Report No. 11 of 2025 — Implementation of Smart City Mission, Government of Karnataka
Comptroller and Auditor General of India
Page 54 of 110
Text as extracted by CivicProof (at ingest, or when the investigator fetched the record). Structured records (portal API responses) are shown as field: value lines.