Chapter-IV 42 the needs of the hospital in compliance with the project scope. However, the utilisation of the system did not come under its purview. The reply was not acceptable as the supporting documents related to the implementation of the electronic health records module were not provided. Additionally, the response highlighted a lack of coordinated efforts with the line department, which has hindered the effective utilization of the installed smart system. B AREA BASED DEVELOPMENT PROJECTS 4.8 Design of footpaths The Indian Road Congress (IRC) 103 (Guidelines for Pedestrian facilities) prescribed the following: ➢ Footpath should be designed in a connected and continuous way like roadways and railways. It should not be sporadically placed wherever convenient but should be provided consistently. ➢ No utility ducts, utility poles, electric/water/telecommunication boxes, trees, signage, or any obstruction should be placed within the walking zone. On scrutiny of records and Joint inspection (May 2024) of smart roads constructed by DSCL, Audit observed that footpaths constructed under the mission were not continuous, not of minimum width, obstructed by utilities and found encroached. (Exhibit 4.1). Exhibit 4.1: Permanent structure obstructing footpath at Davanagere smart city The State Government replied (April 2025) that footpaths were constructed with a minimum width of 1.2 meters, except at locations with ongoing litigation, unclear Right of Way, or near crossroads/approaches. It also stated that obstructions and encroachments were created after the footpaths were built by DSCL. However, the fact remains that these obstructions and encroachments were not cleared, obstructing the smooth passage of pedestrians. 4.9 Impact assessment of Smart City Projects The scope of the duties of the PMC included preparation and submission of project completion reports along with project impact assessment studies listing out all project beneficiaries. Audit observed that only in respect of 356 out of
CAG Report No. 11 of 2025 — Implementation of Smart City Mission, Government of Karnataka
Comptroller and Auditor General of India
Page 62 of 110
Text as extracted by CivicProof (at ingest, or when the investigator fetched the record). Structured records (portal API responses) are shown as field: value lines.