Implementation of Projects and Monitoring 43 562 completed projects (63 per cent), project impact assessment had been completed as detailed in the Table 4.8. Table 4.8: Details of Project Impact Assessment Reports Source: Information furnished by UDD SCP of each city contained the baseline survey and intended output and outcomes after implementation of the Mission. The impact analysis carried out by PMCs should specify whether the outcome/output was as per goals and vision of Smart Cities. However, none of the project impact analysis reports submitted by PMCs benchmarked the outcomes/impact of the project against the goal metrics substantiated with requisite data/information, thus defeating the purpose of impact analysis. Recommendation 6: The State Government should ensure that roads/pavements laid adhere to IRC standards and recommendations of technical committee. 4.10 Absence of coordination between SPVs and user Department Audit observed that infrastructure under the Smart Road projects remained unutilised due to provision of infrastructure without taking into consideration the requirement of end user department as detailed below: 4.10.1 Non-utilisation of water pipelines laid in Smart Road projects The BSCL laid 315mm MDPE34 pipes for a length of 5.72 km for waterline in utility ducts in three smart road packages in Belagavi city based on the final DPR (February 2018) for road development projects. The proposal of up-scaling 24×7 water supply to three cities35 at an estimated cost of ₹1,809.00 crore had been approved (November 2013) under Karnataka Urban Water Supply Modernisation Project (KUWSMP) by KUIDFC. The SCP for BSCL (approved by 2nd HPSC on 11 December 2015) also included 24×7 water supply project under convergence duly considering the scheme already implemented by KUIDFC. However, BSCL failed to coordinate with the implementing agency and ascertain the end user’s requirements as Superintending Engineer (SE), KUWSMP intimated (November 2022) that the 34 Medium Density Polyethylene. 35 Belagavi, Kalaburagi, and Hubballi-Dharwad cities. Smart City Projects completed Projects for which Impact analysis completed Belagavi 97 80 Bengaluru 32 19 Davanagere 85 30 Hubballi-Dharwad 55 14 Mangaluru 39 18 Shivamogga 75 49 Tumakuru 179 146 Total 562 356
CAG Report No. 11 of 2025 — Implementation of Smart City Mission, Government of Karnataka
Comptroller and Auditor General of India
Page 63 of 110
Text as extracted by CivicProof (at ingest, or when the investigator fetched the record). Structured records (portal API responses) are shown as field: value lines.