Implementation of Projects and Monitoring 45 Further, even after repeated request/notices issued by BSCL to KUWSMP & KUIDFC, the restoration works were not carried out as per the specification of BSCL. The issue of restoration of smart city roads by the 24X7 water supply project was discussed in the meeting held on 31 October 2023. The concerned DBOT (i.e., agency) informed that nine km for Clear Water Transmission Main (CWTM) and 78.46 km (Approx) for distribution network comes in smart city road needs to be restored. After detailed discussion KUIDFC directed the KUWSMP and BSCL to jointly prepare a detailed estimate as per 2018-19 SR considering all the above and put up the subject before Executive Committee for approval. Accordingly, an estimate has been prepared by the concerned department for restoration of smart city roads which works out to ₹18.85 crore, which is to be approved by the competent authority. Thus, the infrastructure created under smart road projects got damaged due to laying of 24X7 water pipeline which not only led to wastage of public money but also disrupted the efficiency and purpose of the original project. The State Government accepted the observation and stated that KUIDFC is exploring the option to restore roads to its originality. 4.10.3 Non-utilisation of gas pipes in underground ducts BSCL laid 250mm MDPE pipes for a length of 5.751 km, costing ₹2.01 crore for gas supply in three Smart Road packages. During planning stage, the contractor executing gas pipeline work in the city on behalf of Gas Authority of India Limited, suggested (September 2017) the following modifications to be made in the estimates: • Natural gas pipeline must be carried through MDPE pipes as it could not be laid in the duct. • For every 750-meter interval, provision should be made to install stop off valves. In an emergency, squeezer should be installed to temporarily cut- off supply and change the damaged part. • For every new branch stop off valves must be installed within 10 metres from the tap off. However, on scrutiny of records Audit observed that modification suggested by the contractor was not considered while executing the work. The gas pipeline provided by the BSCL did not have provisions for stop off valves, squeezer etc. In the absence of requisite security infrastructure, the gas pipeline created by the BSCL could not be utilised for gas supply till date. The State Government replied (April 2025) that the provisions for stop of valves and squeezers were not provided by BSCL and are to be installed with requisite technical specifications. The fact remains that absence of co-ordination with the stakeholders, the gas pipes laid under the project could not be utilised as on date. 4.10.4 Usage of DWC ducts for laying High/Low tension cables The scope of Smart Road projects included laying underground electrical ducts for carrying HT/LT electricity cables. TSCL, SSCL and HDSCL utilised
CAG Report No. 11 of 2025 — Implementation of Smart City Mission, Government of Karnataka
Comptroller and Auditor General of India
Page 65 of 110
Text as extracted by CivicProof (at ingest, or when the investigator fetched the record). Structured records (portal API responses) are shown as field: value lines.