(vi) In case in any District, the Through Roads defined in the Core Network do not belong to the Rural Roads category, the Main Rural Links (emanating from the Through Route) will be considered for upgradation on similar lines indicated above. The work of preparing the Comprehensive Upgradation Priority will be taken up only in those districts which are likely to complete new connectivity to eligible habitations within the next 1 year. The Comprehensive Upgradation Priority List (CUPL) will be prepared District-wise for each Priority class (where only a truncated portion of the road is to be taken under upgradation, only that portion needs to be mentioned, by chainage) on the following proforma:- Priority class -------- Total Road Name of Block code in through CN route / MRL Year Year of of last construction periodic renewal population Present of the surface PCI AADT Habitations type 11 served by road The CUPL will be got verified on the ground on sample basis through the STAs and the NQM system before it is processed for further approvals. The STAs will do 100% verification of the List for consistency on the basis of the PCI data given by the District and also sample ground checking. 6.4 After the CNCPL / CUPL is prepared and verified, it shall be placed before the District Panchayat. The Members of Parliament / MLAs shall be given a copy of the CNCPL / CUPL and their suggestions and suggestions of lower level Panchayati Institutions shall be given the fullest consideration by the District Panchayat while according its approval. The CNCPL shall be the basis of all new connectivity Pradhan Mantri Gram Sadak Yojana
Pradhan Mantri Gram Sadak Yojana — Programme Guidelines
Ministry of Rural Development, Government of India
Page 13 of 48
Text as extracted by CivicProof (at ingest, or when the investigator fetched the record). Structured records (portal API responses) are shown as field: value lines.