Skip to content
CivicProof

Pradhan Mantri Gram Sadak Yojana — Programme Guidelines

Ministry of Rural Development, Government of India

(iii) conformation to CNCPL / CUPL;
(iv) full justification in case projected traffic for new construction exceeds 45 CVPD;
(v) separate DPR where CD span exceeds 25 meters;
(vi) economy of design, including use of gravel surfacing, local materials and
fly ash;
(vii) preparation of estimates for 5-year routine maintenance and periodic renewal
of the Through Route as per Para 8.6 of the Guidelines.
The STA will countersign the Proforma, make confirmatory entry in the OMMAS
software and return the scrutinised DPR to the PIU, whereupon the PIU will forward the
scrutinised DPRs to the SRRDA through the prescribed channel.
9.4 The SRRDA will consolidate the proposals from the PIUs, after verifying that
they have been duly scrutinised by the respective STAs. They will then prepare the
24 State Abstract on proforma specified, and send all the Project proposals to the
NRRDA along with the proformae MP-I, MP-II and MP-III.
9.5 The NRRDA will thereupon scrutinise the proposals received from the
SRRDA to ensure that the proposals have been made duly keeping in view the
Programme Guidelines and that they have been duly verified by the STAs. The
proposals for each State would then be put up before the Empowered Committee
for consideration.
10. EMPOWERED COMMITTEE
10.1 At the Central level, the Annual Project proposals received from the State
Governments by NRRDA would be considered by Empowered Committee, to be
chaired by Secretary, Department of Rural Development. The representatives of
the State Government whose proposals are being considered by the Empowered
Committee may be invited to attend the Meetings, as and when required. The
Programme Guidelines

Text as extracted by CivicProof (at ingest, or when the investigator fetched the record). Structured records (portal API responses) are shown as field: value lines.