effectively (by adequate cross-drainage structures such as culverts, minor bridges and causeways), but this does not necessarily imply that it should be paved or surfaced or black-topped. Interruptions to traffic as per permitted frequency and duration may be allowed. 3.14 There may be roads which are Fair-weather roads. In other words, they are fordable only during the dry season, because of lack of Cross Drainage (CD) works. Conversion of such roads to All-weather roads through provision of CD works would be treated as upgradation. It must be noted that on all the road works of the PMGSY, provision of necessary CD works is considered an essential element. 3.15 PMGSY does not permit repairs to Black-topped or Cement Roads, even if the surface condition is bad. 3.16 The Rural Roads constructed under the Pradhan Mantri Gram Sadak Yojana will be in accordance with the provisions of Ministry of Rural Development’s 5 Specification for Rural Roads and specifications as given in the Rural Roads Manual (IRC:SP20:2002). In case of Hill Roads, for matters not covered by the Rural Roads Manual, provisions of Hill Road Manual (IRC:SP:48-1998) may apply. Part II - PLANNING, FUNDING, CONSTRUCTION AND MAINTENANCE OF RURAL ROADS 4. PLANNING FOR RURAL ROADS 4.1 Proper planning is imperative to achieve the objectives of the Programme in a systematic and cost effective manner. The Manual for the Preparation of District Rural Roads Plan and the Core Network, shall be treated as part of the Guidelines and would stand amended to the extent modified by the present Guidelines. The Manual lays down the various steps in the planning process and the role of different Agencies including the Intermediate Panchayat, the District Panchayat as well as the State Level Standing Committee. In the identification of the Core Network, the Pradhan Mantri Gram Sadak Yojana
Pradhan Mantri Gram Sadak Yojana — Programme Guidelines
Ministry of Rural Development, Government of India
Page 7 of 48
Text as extracted by CivicProof (at ingest, or when the investigator fetched the record). Structured records (portal API responses) are shown as field: value lines.