Skip to content
CivicProof

Pradhan Mantri Gram Sadak Yojana — Programme Guidelines

Ministry of Rural Development, Government of India

5.2 In making the District-wise allocation, the road lengths already taken up
under the PMGSY or any other Programme may be excluded (even if the road
works are still under execution). The figures of new construction length will thus keep
on changing every year till such time as all Unconnected Habitations (of the eligible
population size) have been covered in the District.
5.3 In addition to the allocation to the States, a special allocation of upto 5% of
the annual allocation from the Rural Roads share of the Diesel Cess will be made
for:
(i) Districts sharing borders with Pakistan and China (in coordination with
Ministry of Home Affairs)
(ii) Districts sharing borders with Myanmar, Bangladesh and Nepal (in coordination
with Ministry of Home Affairs)
8 (iii) Selected Tribal and Backward Districts (under IAP) identified by the Ministry
of Home Affairs and Planning Commission.
(iv) Extremely backward Districts (as identified by the Planning Commission)
which can be categorised as Special Problem Areas
(v) Research & Development Projects and innovations.
6. PROPOSALS
6.1 All Districts having eligible unconnected Habitations are to prepare Block
and District level Comprehensive New-Connectivity Priority Lists (CNCPL) for
those Districts, of all proposed road links under PMGSY, grouping them in the
following general Order of Priority.
Priority # Population size of Habitations being connected
I 1000+
Programme Guidelines

Text as extracted by CivicProof (at ingest, or when the investigator fetched the record). Structured records (portal API responses) are shown as field: value lines.