10 km may be treated as a cluster for this purpose@),of a connected Habitation or an All-weather road (either existing or planned). In drawing up the proposed road links, the requirements of the people must be taken into account, through the socio-economic/infrastructure values (Road Index) suitably weighted (see Para 4.3) and the alignment having the higher Road Index ought to be considered for selection. (@Substituted vide MoRD letter No. P-17023/38/2005-RC dated 29th February, 2008) 4.6 The Block level Master Plan and the Core Network are then placed before the Intermediate Panchayat for consideration and approval of the Core Network. They are simultaneously sent, along with the list of all unconnected Habitations to the Members of Parliament and MLAs, for their comments, if any. After approval by the Intermediate Panchayat, the Plans would be placed before the District Panchayat for its approval. It will be incumbent on the District Panchayat to ensure that the suggestions given by the Members of Parliament are given full consideration within the framework of these Guidelines. Once approved by the District Panchayat, a 7 copy of the Core Network would be sent to the State-level Agency as well as the National Rural Roads Development Agency. No road work may be proposed under the PMGSY for New Connectivity or Upgradation (where permitted) unless it forms part of the Core Network. 5. FUNDING AND ALLOCATION 5.1 Once the Core Network is prepared and pavement condition survey conducted (see para 6.2), it is possible to estimate the length of roads for New Connectivity as well as Upgradation for every District. States may, each year, distribute the State’s Allocation among the Districts giving at least 80% on the basis of road length required for providing connectivity to Unconnected Habitations and upto 20% on the basis of road length requiring Upgradation under the PMGSY. The District-wise allocation of funds would also be communicated to the NRRDA and STAs every year by the State Government. Pradhan Mantri Gram Sadak Yojana
Pradhan Mantri Gram Sadak Yojana — Programme Guidelines
Ministry of Rural Development, Government of India
Page 9 of 48
Text as extracted by CivicProof (at ingest, or when the investigator fetched the record). Structured records (portal API responses) are shown as field: value lines.