Chairperson of the Intermediate Panchayat concerned once in three months for joint inspection of any PMGSY project(s) as per their choice and according to their convenience. 15.10.3 Similarly, the Assistant Engineer in-charge of the sub-division will request the concerned Sarpanch of the Gram Panchayat once in two months to select any PMGSY project(s) for joint inspection. Joint inspection of the project(s) may be arranged as per their convenience. (#Added by D.O.No.P-17025/24/2007/RC June 27, 2007) 15.11 In sum, the PIU as the first level of quality control is directly responsible for quality management ,i.e ensuring that at all times the contractor is delivering quality in materials and workmanship in accordance with the specifications of the DPR and conditions of the contract. The second level of quality control, of SQMs under the SQC are responsible for Quality control i.e ensuring that 36 the contractor and the PIUs are working to achieve quality standards as per the prescribed standards. The third level of quality control is in reality a quality assurance mechanism. The NQMs are expected to randomly inspect works to ensure that the State Quality control systems are working satisfactorily and will deliver the requisite quality. The three sub-systems are thus not interchangeable , and need to work in tandem . 16. MONITORING 16.1 Effective monitoring of the Programme being critical, the State Governments will ensure that the officials are prompt in sending the requisite reports / information to the SRRDA as well as the NRRDA. The On-line Management, Monitoring and Accounting System (OMMAS), developed for the purpose will be the chief mechanism for monitoring the Programme. To this end, the officials are required to furnish, ‘On-line’, all the data and information, as may be prescribed by the NRRDA from time to time, in the relevant module of the OMMAS . They shall be responsible for uninterrupted maintenance of the Computer Hardware and Software as well as Programme Guidelines
Pradhan Mantri Gram Sadak Yojana — Programme Guidelines
Ministry of Rural Development, Government of India
Page 38 of 48
Text as extracted by CivicProof (at ingest, or when the investigator fetched the record). Structured records (portal API responses) are shown as field: value lines.